Another fantastic OceanSave installation to help better protect our oceans and waterways.
This OceanSave OS1618 was installed last week – as part of the Legana Park subdivision, to help West Tamar Council better protect the Tamar River in Tasmania. A very big thank you to 6ty° Architecture Surveying Engineering, Sheriff Civil, and Tas Concrete Products.
The OceanSave is a vortex type engineered stormwater treatment asset designed to remove litter, gross pollutants, sediment and associated pollutants from stormwater runoff as either a stand-alone technology or as part of a ‘treatment train’ and employs a unique screen design that maximizes hydraulic capacity and pollutant removal whilst simultaneously cleaning the screen surface. The installed OS1618 has a water quality flow rate of 350 litres/ second, with a sump storage capacity of 11.9m3.
To find out more about the OceanSave and how Ocean Protect can help you, please contact us.