A recent OceanSave has been installation to help protect our oceans and waterways – this time as part of a residential subdivision at How Road, Aldinga in the City of Onkaparinga, South Australia. The OceanSave system was installed to help reduce pollutant loads flowing into downstream wetlands and waterways. An OceanSave OS1612 was installed – with a treatment flow rate of 250 litres/ second and sump storage of 4.4 cubic metres. A huge thank you to WGA for the design work and the BMD Group for installation. Learn more about the OceanSave here or please contact us.
OceanSave installation at Aldinga, South Australia
Other News Posts
Official Release of the WSUD Maintenance Compliance Framework
Ocean Protect are excited to announce the official release of the consultation draft of the WSUD Maintenance Compliance Framework! The…
Dinner at the Captain’s Table
Last month, Ocean Protect were proud sponsor of the Sea Shepherd Australia’s “Dinner at the Captain’s Table”. The event was…
Hydraulic Conductivity Test at Keeley Park, Clayton South, Victoria
Lily Dorraj, our Specification Engineer, is back at Keeley Park in Clayton South, Victoria, for a maintenance of our Filterra® biofiltration…
AWA Water E-Journal paper published for StormFilter PFAS technology
The study “Per and poly-fluoroalkyl substance (PFAS) removal by a radial flow cartridge system” was recently published in the Australian…
Stormwater Victoria Tour of Keeley Park, Clayton South, Victoria
Earlier this month, over 50 stormwater professionals visited Keeley Park, Clayton South, Victoria – as part of a Stormwater Victoria…