Skip to content

Geelong Football Stadium

SITE

Geelong Football Stadium, Victoria 3220

SPECIFIER

PB World

CONTRACTOR

Auswater Solutions

PRODUCT(S)

Description

The client was looking for a low cost storage solution for a stormwater harvesting project and needed to minimise the risk on a 6m deep installation below a car park. Ocean Protect provided their expertise in storage systems and provided a solution within acceptable safety factors. The final design was developed with input from the client, contractor and Ocean Protect.

MAINTENANCE

The Vortech model VX11000 GPT has a storage volume of 4.3m3 and has an estimated maintenance frequency of 4-6 months.

GALLERY