Ascot Aurora
QANTAS Facility, Brisbane Airport
Hungry Jacks, Rochedale
Mineral Sizer Court, Narangba QLD
Herston Quarter, QLD 4006
Amart Warehouse, QLD
Manly IGA
It is proposed to connect all large roof areas of the proposed re-use tanks. The water shall be used for irrigation and toilet flushing as a minimum. These tanks will then surcharge into proposed Stormwater infrastructure and be treated by the StormFilter prior to discharge from site. All pavements shall be collected by a series of field inlets fitted with EnviroPods as pre-treatment prior to being treated by the StormFilter and discharging to the underground infrastructure.